Navigating the permits required for building and using an irrigation pond can be a complex process, as there are typically an assortment of local, state, and federal requirements. First and foremost, the need for a water rights or appropriation permit is essentially universal. This permit is typically required when you intend to use water from a natural source, such as a river or stream, for filling and maintaining your irrigation pond. It ensures that your water usage does not conflict with existing water rights and adheres to local water management policies. Environmental permits are another critical aspect, particularly if your irrigation pond construction has the potential to impact the environment.

In the case of larger ponds or those featuring substantial embankments, a dam safety permit may be required. This permit focuses on the structural integrity and safety of the pond's construction, ensuring it complies with safety standards and regulations. Given the potential for increased runoff and sedimentation resulting from pond construction, stormwater management permits may also be necessary in some jurisdictions. These permits address the management of stormwater runoff to prevent adverse impacts on the surrounding environment. Local building or land use permits are often essential to ensure your pond construction aligns with local zoning and land use regulations.


Liners by BTL

AquaArmor Pond Liner

The most versatile liner on the market today, AquaArmor maximizes protection from harmful UV rays, tear resistance and punctures that cause leaks. Simply the best liner on the market.

Newest Articles: